Senior Construction Scheduling Specialist Job at Kelly Science, Engineering, Technology & Telecom, Seadrift, TX

QzQyVnJXaEtCREdOVC84ckJSYlV6MDc1OHc9PQ==
  • Kelly Science, Engineering, Technology & Telecom
  • Seadrift, TX

Job Description

Kelly is currently seeking an experienced Senior Construction Scheduling Specialist in the Seadrift, Texas area! The Senior Construction Scheduling Specialist acts as a technical resource for Scheduling within the Global Project Methodology (GPM) work process and supports establishment of the overall construction schedule baseline and reporting to monitor and control the construction activities within established tolerances of the baseline supporting efficient project execution. In this role you coordinate data inputs from the various construction contractors and internal disciplines to ensure accurate forecasts and reporting of schedule and engage the project steering team to understand causes of the deviation and the need to establish actions to mitigate, where deviations from established tolerances occur. Requires expanded conceptual and practical knowledge in own job discipline and broadens capabilities.

Responsibilities / Duties

  • Recommendations on cycle time reduction opportunities and techniques
  • Develops and maintains comprehensive integrated master project schedules including Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages.
  • Utilizes project cost estimates to resource load project schedules and gain alignment with estimated scope of work and the project schedule.
  • Recommendations on cycle time reduction opportunities and techniques
  • Performs staffing density checks or staffing limitation checks to validate schedule durations and ensures resource-level supports the project strategy.
  • Leads project teams in forecasting schedule challenges and offers analyses and solutions to complete the project on schedule.
  • Performs critical path analysis to determine problem areas in regard to project schedule and resource overloads and offers alternative courses of action to the project team.
  • Evaluates project deviations to assess schedule impact for proper decision making and recovery plans.
  • Applies established schedule management practices to ascertain critical schedule issues and recommend corrective actions. Experience
  • Practical experience as a scheduler working for a large main construction contractor in coordinating multiple subcontractors (e.g. in coordination of civil, structural steel, piping, insulation and scaffolding etc
  • Assist in developing and maintaining comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages.
  • Maintains construction schedule during the project life cycle monitoring progress and incorporating modifications where changes in the original scope occur or delays are encountered.
  • Leads project teams in forecasting schedule challenges and offers analyses and solutions to complete the project on schedule.
  • Evaluates project deviations to assess schedule impact for proper decision making and recovery plans.
  • Applies established schedule management practices to ascertain critical schedule issues and recommend corrective actions.
  • Assist in quantity tracking and installation rates
  • Performs quantity surveys to validate construction progress

Required qualifications

  • A minimum of a bachelor's degree in any discipline or 10 years of experience in project controls, engineering, manufacturing, or related experience.
  • Prior construction related experience.
  • Proficiency within P6.

Job Tags

For contractors, For subcontractor,

Similar Jobs

State of Florida

ADULT EDUCATION TEACHER Job at State of Florida

 ...Requisition No:865108 Agency: Department of Corrections Working Title: ADULT EDUCATION TEACHER Pay Plan: Career Service Position Number:70047484 Salary: $51,500.02 Annually Posting Closing Date: 12/29/2025 Total Compensation Estimator We... 

Guthrie

Paramedic - Emergency Med Health Serv - Part Time Job at Guthrie

 ...is an allied health professional who provides a wide range of patient care and transportation outside the hospital setting. Under emergency and nonemergency conditions. The Paramedic will encounter all types of patients with complaints of chest pain to multiple patient... 

Physicians Rehab Solution

Medical Receptionist (FT) at Orthopaedic Specialists of Austin Job at Physicians Rehab Solution

Orthopaedic Specialists of Austin is seeking a Full-Time Medical Receptionist in our outpatient clinic located in Leander, TX. Our licensed physical therapists provide integrated, state-of-the-art therapy care and rehabilitation to our patients. Company Benefits...

HealthCare Recruiters International

Nurse Practitioner / Physician Assistant (VA DBQs) Job at HealthCare Recruiters International

 ...reliable internet (no hardware provided) NP/PA Requirements Active NP or PA license in good standing (participating state) New grads welcome ; VA/disability exam experience not required Strong fit for detail-oriented clinicians who like structured exams +... 

BEADLES NURSING HOME

Physical Therapist Job at BEADLES NURSING HOME

 ...Position Summary: We are seeking a licensed and motivated Physical Therapist to provide skilled therapy services to our residents. The ideal...  ...patients is a plus Benefits: Competitive salary based on experience Flexible scheduling options Health, life,...